عن الكتاب
The full story of Mosul dam from the studies stage until 2016. The problems of dissolution of gypsum in the foundations are described. the grout curtain and grouting works from 1985 up to 2015 are details. The dangerous if the dam fails are presented. Suggestion of permanent solutions such as Construction of Protective Dam, i.e., Badush dam is also presented