The full story of Mosul dam from the studies stage until 2016. The problems of dissolution of gypsum in the foundations are described. the grout curtain and grouting works from 1985 up to 2015 are det
| اللغة | التسمية | الوصف | أسماء أخرى |
|---|---|---|---|
| افتراضيا لجميع اللغات | لم تُضف التسمية |
||
| العربية | كتاب سد الموصل القصة الكاملة |
The full story of Mosul dam from the studies stage until 2016. The problems of dissolution of gypsum in the foundations are described. the grout curtain and grouting works from 1985 up to 2015 are det |
بيانات
2010
لا مرجع
openlibrary
لا مرجع
The full story of Mosul dam from the studies stage until 2016. The problems of dissolution of gypsum in the foundations are described. the grout curtain and grouting works from 1985 up to 2015 are details. The dangerous if the dam fails are presented. Suggestion of permanent solutions such as Construction of Protective Dam, i.e., Badush dam is also presented